Stacks Image 300


Gifford Civil Engineers Case Study

These images were commissioned by civil engineers Gifford & Partners, now known as Ramboll. The two shoots featured are from 2006 and 2007 are of the renewable-energy wind farm installation of Tir Mostyn Windfarm, Denbighshire, Wales, and the Celtic Gateway footbridge in Holyhead.

CLICK ON IMAGES BELOW TO ENLARGE
PLEASE ALLOW A FEW SECONDS FOR THE IMAGE GALLERY TO LOAD

Renewable energy Tir Mostyn Windfarm2007
Renewable energy Tir Mostyn Windfarm2007
Celtic Gateway Bridge Holyhead for Civil Engineerings
Celtic Gateway Bridge Holyhead for Civil Engineerings


Your image is your future: trust it to a true professional!



Inside Out Photography - Manchester - Tideswell/Buxton

Chorlton - Manchester
   -   T  0161 860 5769   -   E  info@insideoutphoto.co.uk
Tideswell - Buxton   -   T  07831 344 722   -   E  tideswell@insideoutphoto.co.uk

Stacks Image 357
Stacks Image 360
Stacks Image 363
Stacks Image 368
Stacks Image 371
Stacks Image 374
2,234